Opening New Energy Pathways Across the West
Back to Previous Page

Opening New Energy Pathways Across the West

The Southwest Intertie Project-North (SWIP-North) is a bidirectional 500 kV transmission line that will link Nevada and Idaho, strengthen grid reliability, reduce congestion and open new energy pathways across the West.

Completing the Southwest Intertie Project

SWIP-North is the final segment of a high-voltage transmission corridor running from southern Nevada to southern Idaho. It completes the connection to two existing Nevada projects: the 60-mile DesertLink line connecting the Eldorado and Harry Allen substations and the 231-mile ON Line connecting the Harry Allen and Robinson Summit substations.

SWIP-North’s 500 kV transmission line will extend 209 miles through Nevada and 76 miles through Idaho, primarily within designated energy corridors and alongside existing infrastructure, where practical.

IN NEVADA:
209 miles of line
- 185 miles on public land
- 24 miles on private land
IN IDAHO:
76 miles of line
- 44 miles on public land
- 32 miles on private land

Connecting the Pacific Northwest and the Desert Southwest, this Project Delivers:

✓
The final link enabling the two-way flow of 2,000+ MW of electricity
✓
Greater reliability during peak demand
✓
Improved resilience during extreme weather events
✓
Increased flexibility to move power north and south
✓
Expanded capacity to serve growing communities in Nevada and Idaho
✓
Millions in local and state tax revenue to help fund local essential services
✓
Shared capacity by the California ISO, NV Energy and Idaho Power
✓
Greater flexibility for the Western grid to move power where it is needed

On Track for 2028 Operation:

Summer 2026
Nevada Construction Start
Fall 2026
Idaho Construction Start
Summer 2028
Planned In-Service

Opening New Energy Pathways Across the West

SWIP-North is the final segment of the Southwest Intertie Project — a transmission corridor first conceived in the 1980s and advanced by LS Power since it acquired development rights in 2005. Once complete, the corridor will span 576 miles, connecting Idaho’s Magic Valley near Twin Falls to Nevada’s Eldorado Valley south of Las Vegas.

How We Work

WILDLIFE AND HABITAT

In coordination with the Bureau of Land Management (BLM), Nevada Department of Wildlife (NDOW), and U.S. Fish & Wildlife Service, the project plan includes key design considerations that will protect wildlife and habitat.

WEED MANAGEMENT AND GRAZING

Disturbed areas will be restored following construction along with ongoing vegetation monitoring. Our commitment is to leave the land in as good or better condition than before construction.

COMMUNITY SUPPORT

More than just electrical connections, we connect communities where our transmission infrastructure is located. We’re proud to support more than 20 non-profits and organizations in Nevada and Idaho.

ON-GOING COMMUNICATION

A locally-based team member will be available as the primary point of contact throughout construction. Landowners will receive advance notice of upcoming activity. If you have any concerns, reach out to us.

Project Updates & Resources

Press Release Article